Data Centre
As-built Modelling of Data Centre
Recruited by a contractor, Next Synergy Solutions’ objective for this project was to generate an as-built model LOD 300 aligned with the GFC drawings and on-site inputs. The project posed notable challenges, particularly in the MEPF discipline, given the substantial size and complexity of the site. The absence of redline markups on the GFC drawings after site modification necessitated daily interactions with on-site personnel during the execution stage.
To address this, we conducted regular meetings to obtain the most recent data, relying on on-site photographs and videos. This iterative process allowed us to continuously adapt and refine the models, ensuring they accurately mirrored the changing on-site conditions.
Project Size
120,000 SF
Services
3D Modelling, As-Built Documentation, As-Built Modelling, MEPF Modelling
Market Sectors
Technology