K12 Education Campus
Detailed As-built models from GFC Drawings and Site Images
Employed by the contractor, Next Synergy Solutions’ primary objective for this project was to populate 3D models for Architectural, Structural, Mechanical, Electrical, Plumbing, and Fire disciplines and seamlessly integrate them into a unified platform. Our initial input included GFC drawings and a limited set of on-site images.
We conducted thorough site visits to grasp the on-site conditions, enabling us to comprehensively understand the existing site conditions. Subsequently, we meticulously developed an as-built model, aligning it with both the site conditions and the provided drawings.
Project Size
250,000 SF
Services
ASMEPF Modelling, As Built Documentation, As Built Modelling
Market Sectors
Education