Hotels Building Modeling

Developing a model from conception to the GFC level for a large hospitality group. 

Hired by architects, our overarching project goal was to develop a detailed representation of each stage in the building process, culminating in extracting GFC (Good for Construction) drawings from the finalized coordinated model. Commencing at LOD 100, the concept-level model, we systematically progressed through various stages, updating the model based on received details and requirements. Following thorough coordination with other disciplines and specialized equipment suppliers, we refined the model to extract GFC drawings. We subsequently sent the drawings and the model to the site for execution. 

In addition to the building model and drawing extraction, Next Synergy Solutions concurrently worked on the fitout scope for the hotel building. This scope encompassed aspects such as flooring types, furniture design, and furniture arrangements, ensuring a comprehensive approach to the project’s architectural and interior elements.  

  

Project Size

140,000 SF 

Services

Architectural Modelling, Structural Modelling, Concept Modelling, Design Development Modelling, Clash Co-Ordination 

Market Sectors

Hospitality